|
No |
Tanggal |
Uraian |
Jumlah |
Keterangan |
|
|
Penerimaan |
Pengeluaran |
||||
|
1. |
10/01/2014 |
Panjar Biaya Perkara |
491.000 |
|
|
|
2. |
10/01/2014 |
Biaya Pendaftaran |
|
30.000 |
|
|
3. |
10/01/2014 |
Biaya Proses |
|
50.000 |
|
|
4. |
21/01/2014 |
Panggilan Penggugat |
|
103.000 |
|
|
5. |
21/01/2014 |
Panggilan Tergugat |
|
103.000 |
|
|
6. |
03/02/2014 |
Panggilan Tergugat |
|
103.000 |
|
|
7. |
11/02/2014 |
Tambah Panjar |
218.000 |
|
|
|
8. |
13/02/2014 |
Panggilan Tergugat |
|
103.000 |
|
|
9. |
13/02/2014 |
Panggilan Tergugat |
|
103.000 |
|
|
10. |
27/02/2014 |
Redaksi |
|
5.000 |
|
|
11. |
27/02/2014 |
Materi |
|
6.000 |
|
|
12. |
27/02/2014 |
Sisa Panjar |
|
103.000 |
|
|
|
709.000 |
709.000 |
|
||
|
13. |
27/02/2014 |
Sisa Panjar |
103.000 |
103.000 |
|
|
14. |
04/03/2014 |
Pemberitahuan Putusan |
|
103.000 |
|
|
|
103.000 |
103.000 |
|
||
